Outdoor park walking trails

 

Client Testimonials:

“This year’s plum rain season brought heavier rainfall than ever, but after the renovation, waterlogging issues dramatically improved—we no longer face annual repairs like before.”

— Mr. Chen, Director of Park Administration

 

“Previously needed staff to drain water. Now elders walk right after heavy rain—these tiles greatly enhance life happiness!”

— Mr. Wang

 

Challenges:

1.Public Inconvenience:

Long-term water accumulation caused resident mobility issues, while surface deformation created tripping hazards.

2.High Maintenance Costs:

Pooled water and lack of sunlight led to premature fading of rubber surfaces, requiring frequent repairs to address aesthetic deterioration.

 

Order Story:

Shanghai is the main sales area of Suelofit in China, and after the person in charge of Qingpu community contacted us, Shanghai team immediately conducted onsite measurements. Recommended 30mm Rrubberized Floor Tiles (08) with rapid construction plan.

Post-confirmation, tiles shipped from Hebei factory:

Completed 48-hour accelerated renovation.

Progress remained unaffected despite ongoing torrential rains.

Project successfully concluded.

Withstood 3 orange rainstorm alerts post-completion with zero flooding/slip reports.

 

Rrubberized Floor Tiles (08):

The specially designed drainage channels accelerate water dissipation. Laboratory tests confirm:

With 5° inclined channels under 50mm/h rainfall intensity, water clearance speeds increased by 4 times.

 

Rain Construction:

Special drainage base mats enabled work during storms.

 

Yangtze River Delta Flood Season Initiative

Suelofit I-beam tiles serve 37 Shanghai communities with 100% on-time rainy season delivery record.

✓ 72-hour rapid response guarantee

✓ Real-time construction weather insurance